27th National Arbitration Committee Meeting held on 25th July, 2014

                        Back
Posted on 25th July, 2014

M/s. Lhojong Const. Pvt. Ltd Vs. ILCS, Taktse, Trongsa. NAC arbitrated contractual dispute on the following issues:

  1. 1.Delay in payment and
  2. 2.Imposing liquidated Damage without considering hindrances.

On 1st sitting of  NAC meeting discussed:

  • 1.To authenticate the issuance of original drawings on time or not;
  • 2.Issues on inaccessibility of the road to construction site;
  • 3.Calculate on the hindrances claimed by the contractor;

The NAC will convene 2nd sitting of NAC meeting.