The Allowable Range of Contract cost and Work Ceiling Increased.

                        Back
Posted on 10th November, 2009

CIRCULAR

This is for information of the Procuring Agencies and Contractors that the 52nd Meeting of Construction Development Board held on the 14th September 2009 has enhanced the Allowable Range of Contract Cost as follows with immediate effect:

 

Class

Existing Allowable Range of Contract Costs

Revised Allowable Range of Contract Costs

 D (Petty)  

1. Up to 1.5 million

2. Allowed to undertake only one work at a time.
 

1. Up to 2.0m

2. Allowed to undertake only one work at a time.
 C  

1. Above Nu. 1.5 m to 7.5 m

2. Allowed to undertake a maximum of three works at a time subject to meeting the bid capacity criteria.
 

1. Above Nu. 2.0 m – up to 9.0 m

2. Allowed to undertake a maximum of three works at a time subject to meeting the bid capacity criteria.
 B  

1. Above Nu. 7.5 m to 15 m

2. Allowed to undertake three works at a time subject to meeting the bid capacity criteria.
 

1. Above Nu. 9.0 m – up to 19.0 m

2. Allowed to undertake four works at a time subject to meeting the bid capacity criteria.
 A  

1. Above Nu. 15 m with no upper ceiling

2. Allowed to undertake five works at a time subject to meeting the bid capacity criteria.
 

1. Above Nu. 19.0m with no upper ceiling

2. Allowed to undertake five works at a time subject to meeting the bid capacity criteria.

 

Therefore, all concerned are hereby requested to note the above changes during the procurement of works.

Zhabtog Lyonpo
Chairman, CDB